TEST
TEST
TEST
TEST
TEST
TEST
TEST
TEST
TEST

Ballast Water Treatment Plant Refits

Our services:

  • feasibility studies
  • 3-D scan (conducted during regular port stays, whilst cargo operations are ongoing)
  • basic design of piping and foundations
  • detail design of piping and foundations
  • workshop documentation for piping (isometrics) and foundations incl. material, profile and bar lists
  • updates of GA-Plans, engine room arrangement drawings, diagrams, valve lists, electrical documentation
  • coordination drawings for new piping
  • Ballast Water Management Plans according to the D2 standard
Type of vesselDWTLengthNo. of shipsBWTS size
LPG Tanker10.309t119m1300m³/h
Oil Tanker34.628t172m21000m³/h
Chemical/ Oil Tanker16.421t145m4500m³/h
General Cargo12.961t138m1500m³/h
General Cargo12.641t138m2500m³/h
LPG Tanker7.876t118m1500m³/h
LPG Tanker3.890t95m1250m³/h
RoRo Cargo7.250t122m1200m³/h
LPG Tanker4.995t113m1250m³/h
LPG Tanker6.211t108m1300m³/h
LPG Tanker6.174t108m1300m³/h
Container Ship120.892t349m41000m³/h
Container Ship100.910t333m71000m³/h
Container Ship103.845t334m21000m³/h
Container Ship28.178t186m11500m³/h
Chemical/ Oil Tanker8.132t116m1500m³/h
General Cargo4.111t89m3334m³/h
General Cargo4.508t89m3334m³/h
Chemical/ Oil Tanker38.334t183m11000m³/h