03.07.2023

ASP Bilgenentöler 1 -Conversion Successful

The former „Olde Baas“ becomes the ”ASP Bilgenentöler 1”.

HB Hunte Engineering was happy to support the project, together with Sven Brand (Naval Design and Engineering), in strong cooperation with RINA.

Thank you all and we look forward to our next joint project!

(The reference article is in German language only)

(Zeitschrift Binnenschifffahrt / Ausgabe 05|23)
(Zeitschrift Binnenschifffahrt / Ausgabe 05|23)
(Zeitschrift Binnenschifffahrt / Ausgabe 05|23)

Back to news
13.03.2024

Successful launching of our 3.500 TEU Dual-Fuel Container Ship

Designed by HB Hunte Engineering!On the morning of 4th March 2024, the first vessel of a siries of 3.500-TEU Dual-Fuel…

03.07.2023

ASP Bilgenentöler 1 -Conversion Successful

The former „Olde Baas“ becomes the ”ASP Bilgenentöler 1”. HB Hunte Engineering was happy to support the project, together with…

14.06.2023

Christening of the “Hegemann V” in Bremerhaven

On June 14th 2023 the new dredger “Hegemann V” was ceremonially christened in Bremerhaven’s Fischereihafen. HB Hunte Engineering was significantly…