After the successful installation of the ballast water treatment system
of type OBS 334-370 from the BWTS manufacturer Optimarin on board ,,MS KARIN
LEHMANN’’ in May 2020, HB Hunte Engineering was happy to receive the
information from shipping company Lehmann that also the sister vessel ,, MS
ANNA LEHMANN’’ has been retro-fitted without problems and in short time with
the before mentioned system in July.
HB Hunte Engineering provided the Basic- and Detail Engineering as well as the
electro-technical planning for the retro-fit.
The by HB Hunte Engineering applied 3D Scan Technology offers the great
advantage related to projects where sister ships are existent, that the piping
model of the first ship can be transferred into the 3D Scan point cloud taken
on board the sister vessel, deviations of structures and piping can be verified
and the fabrication documentation adapted accordingly, this methodology is
significantly reducing the required efforts and costs.
Designed by HB Hunte Engineering!On the morning of 4th March 2024, the first vessel of a siries of 3.500-TEU Dual-Fuel…
The former „Olde Baas“ becomes the ”ASP Bilgenentöler 1”. HB Hunte Engineering was happy to support the project, together with…
On June 14th 2023 the new dredger “Hegemann V” was ceremonially christened in Bremerhaven’s Fischereihafen. HB Hunte Engineering was significantly…